Plastic injection moldsFrom part drawing
to production
Mold design, tool manufacturing and custom injection molding. Share your part requirements to discuss feasibility, inspection and delivery.

What Nodinson DoesExport Tooling & Precision Molding
Export Injection Tooling
Mold steel grade, target life, and acceptance criteria are specified for each project.
Mirror Spark EDM & CNC
CNC milling and EDM services support mold manufacturing and component work.

We review part, mold, material, and press requirements with customers and confirm project-specific design and inspection criteria before production.
Injection Molding
Molding capacity and process suitability are confirmed for each part and production plan.
Turnkey & Bridge Supply
Tooling, molding, and delivery options can be compared in a project quotation.
Solving the 6 Critical Pain PointsOf Overseas Mold Sourcing
Clear requirements help a tooling project move forward. Review these six topics with the team before agreeing the scope and quotation.
Confirm the required mold steel
Steel selection affects corrosion behavior, polishing, heat treatment, and expected service conditions.
Agree on the steel grade and any requested mill certificate or heat-treatment records in the quotation.
Match the mold to the target machine
Platen, locating, ejection, water, and electrical interfaces vary between machines.
Provide machine and platen information so agreed interfaces can be reflected in the mold design.
Understand delivery terms and import costs
Customs classification, duties, freight, and clearance arrangements depend on the goods and destination.
Confirm delivery terms and cost scope in the quotation; verify import classification and duties with your customs adviser.
Keep reviews and milestones visible
Tooling projects involve design approvals, manufacturing stages, trials, and delivery coordination.
The project schedule, review stages, and communication cadence can be set out before work begins.
Agree confidentiality before sharing CAD
Part models and drawings may contain confidential product and manufacturing information.
Arrange and sign the applicable confidentiality agreement before sending confidential design files.
Plan packaging for the route
Tool size, destination, handling, and transit conditions inform the packaging plan.
Specify the packaging and corrosion-protection scope for the shipment before dispatch.
Want to test our engineering response?
Share your project requirements to discuss a DFM review. Scope, confidentiality terms, and response timing are confirmed before file review.
Typical Tooling Project WorkflowStages and Timing Confirmed Per Project
These stages are a planning guide. The project schedule, deliverables, and sample dates are confirmed in the quotation and project plan.
Stage 01: RFQ and design review
Review part, material, quantity, and tooling requirements before finalizing project scope.
Quality and Commercial ScopeConfirm Requirements in the Project Contract
Acceptance criteria, service levels, warranties, deliverables, and exclusions should be agreed in writing for each project.
Agree sample acceptance criteria
Define drawing revision, inspection method, sample quantity, and any correction or resampling terms in the project contract.
Specify expected tool life
Target tool life, operating conditions, maintenance assumptions, and any warranty terms should be agreed for the selected design and materials.
Review price and inclusions
The quotation should identify included work, tooling and sample scope, delivery terms, and any assumptions or exclusions before order confirmation.
Agree project contacts and updates
Confirm the project contacts, working hours, review points, and update cadence when the project schedule is established.
Sign an NDA before sharing CAD
Arrange a separate written confidentiality agreement and confirm its scope before sending confidential design files.
Define required quality records
Specify dimensional inspection, ballooned reports, material certificates, and heat-treatment records in the RFQ so availability and scope can be confirmed.
Need to discuss an NDA before sharing CAD?
Contact the company to arrange a separate written agreement before sending confidential files.
Explore the detailsUseful inputs before you request a quote
Product catalog
95 mold and part references across ten categories. Find a starting point for your own project.
Tooling requirements
Press interfaces, material selection, surface finish and inspection inputs to agree before production.
Machining & inspection
Company-published CNC, EDM, molding and measurement equipment, with project-specific checks.
Shipment planning
Compare delivery scope and organize quoted freight, duty and handling amounts.
Application examples
Illustrative engineering questions for automotive, medical, overmolding and machined parts.
Manufacturing Capabilities OverviewCore Tooling & Molding Parameters
| Capability | Specification Range | Standards & Verification |
|---|---|---|
| Mold Manufacturing | 2-plate, 3-plate, unscrewing tooling, insert molds, 2K overmolding | DME, HASCO, LKM standards |
| Injection Molding Press | 80T to 400T clamping force capacity | Production trials & batch molding |
| Tool Steel Selection | P20, 718H, H13, S136, NAK80, 1.2344 (custom on request) | Material mill certificates provided |
| Machining Tolerances | Down to 0.01 mm for tooling inserts; 0.02 mm for molded parts | CMM 3D metrology inspection |
| Surface Finish | SPI A1 to D3 polish, VDI 3400 spark erosion textures, EDM matte | Sample plaque visual comparison |
Quality Planning for Tooling ProjectsAgree Inspection and Delivery Requirements
Material requirements
Specify the required steel grade and any mill certificate or heat-treatment records in the RFQ. Confirm availability before order placement.
Inspection planning
Agree the drawing revision, critical dimensions, measurement method, and inspection report scope for the project.
Sampling and review
Trial, sample review, reporting, and any customer witness arrangements are agreed in the project schedule.
Packaging and delivery
Confirm packaging, corrosion protection, crating, and delivery terms for the destination and route before dispatch.
Set T1 acceptance and correction terms
Define the approved drawing revision, acceptance criteria, correction responsibilities, and resampling schedule in the project contract.